Bahrain, Muharraq Island

Bahrain LNG import terminal

Meeting Bahrain’s growing energy needs through innovative marine infrastructure
Bahrain’s LNG Import Terminal was developed to support the Kingdom’s increasing demand for natural gas, essential for both industrial and urban growth. Six Construct was entrusted with the design and construction of the marine structures, including a double berth jetty and a protective breakwater. The project showcases BESIX’s offshore expertise and commitment to delivering complex infrastructure under challenging conditions.

Project overview

Awarded at the end of 2015, the Bahrain LNG Import Terminal project involved the design and construction of key marine infrastructure to accommodate Floating Storage Units (FSU) and LNG carriers. The scope included a double berth jetty and a 500-metre-long, 15-metre-deep breakwater. BESIX Engineering led the design phase, and the site team was mobilized following the Final Notice to Proceed in November 2016. The project was successfully completed in 2018.

Scope of works

  • Design and construction of marine structures

  • Double berth jetty for FSU and LNG carriers

  • 500-metre-long, 15-metre-deep breakwater

  • Offshore construction and engineering

Highlights

  • Fast-track deployment following Final Notice to Proceed

  • Offshore construction under challenging conditions

  • Integration of design and build expertise from BESIX Engineering and Six Construct

  • Strategic infrastructure supporting Bahrain’s energy security

Project details

Project nameBahrain LNG import terminal
LocationMuharraq Island, Bahrain
Building period2015 - 2018
Area of expertiseJetties
Stakeholder(s)BESIX, Six Construct
Contract typeDesign & Build
ClientTermco
Total Value Euro€ 126.213.332